Home › New roofs › How a new roof goes on

How a new roof goes on

From the first look to the last swept-up nail: every stage of a re-roof, what we're doing at each one, and the words you'll hear us use.

Scroll through the ten stages. The drawing builds up as you go and points out each part of the roof.

Cross-section of a pitched roof, built up stage by stageSlipped tileCracked ridge mortarMossPerished feltRotten fasciaScaffoldGuard railToe boardWorking platformBare raftersRubbish chute to the skipRafterRidge boardPurlinWall plateCeiling joistsSistered rafterBreathable membraneTile battensEaves trayEaves ventilationNew tilesClipped and nailedHeadlap (the overlap)Ridge tileDry ridge rollRidge battenBack gutterStep and cover flashingApron flashingFasciaGutterDownpipeVented soffitBuilding Regs signed off ✓10-year written guarantee ✓
  1. Step 1 · Before we start

    A proper look first

    Before anyone talks prices, we get up close. We check the tiles, the ridge along the top, the felt underneath and the timbers holding it all up, and we measure so the price is right. Then you get a fixed price in writing that says exactly what's included.

    Ridge
    The line along the very top of the roof.
    Felt or underlay
    The sheet under the tiles: the roof's second line of defence.
  2. Step 2 · Day 1

    Scaffolding goes up

    A full scaffold goes up front and back, with guard rails and toe boards so nothing (and nobody) comes off the edge. It's our safe working platform at gutter height, and somewhere to keep materials off your drive. It usually goes up a day or two before we start, and it's often the noisiest part of the job.

    Toe board
    The plank along the edge of the platform that stops tools and tiles rolling off.
  3. Step 3 · Days 1 to 2

    Off with the old roof

    We strip the old tiles, battens and felt a section at a time, rather than opening the whole roof at once. It all goes down a rubbish chute into the skip. There will be some dust in the loft, so it's worth covering anything you keep up there.

    Battens
    The thin strips of timber the tiles hang on.
    Stripping
    Taking the old roof covering off, down to the timbers.
  4. Step 4 · Day 2

    Checking the bones

    With the tiles off we can see the timbers properly. Anything rotten or split gets put right, usually by fixing a new length of timber alongside the old one, which is called sistering. If we find something we didn't expect, we show you and agree the cost before we do it.

    Rafters
    The sloping timbers that carry the roof.
    Purlin
    The big beam that props the rafters halfway up.
    Wall plate
    The timber along the top of the wall that the rafters sit on.
    Ridge board
    The board along the top where the rafters meet.
  5. Step 5 · Days 2 to 3

    Membrane and battens

    Next comes a breathable membrane: a tough sheet that stops any rain that gets past the tiles, but lets damp air out of the loft so the roof doesn't sweat. New treated battens are nailed on top, spaced to suit the tile. Along the bottom, eaves trays guide any water into the gutter, and vents keep air moving through the roof.

    Eaves
    The bottom edge of the roof, where the gutter is.
    Gauge
    The spacing between the battens, set by the tile you've chosen.
    BS 5534
    The British Standard for fixing battens and tiles. It's what we work to.
  6. Step 6 · Days 3 to 5

    The tiles go on

    Tiling starts at the eaves and works up to the ridge, each row overlapping the one below. Every tile is nailed or clipped to the battens to meet today's wind rules, so they stay put in a storm. This is when your house starts to look different, and it moves quickly.

    Headlap
    How far each row of tiles overlaps the row below.
    Interlocking tiles
    Tiles with grooves down the sides that lock into their neighbours.
  7. Step 7 · Day 5

    Ridge and hips

    The ridge tiles go on last, fixed with a dry ridge system: screws, clips and a vented roll instead of mortar. With no mortar to crack and wash out, they stay put and need far less looking after. Hips and verges get the same dry-fixed finish.

    Hips
    The sloping edges where two roof slopes meet, on a hipped roof.
    Verge
    The edge of the roof at a gable end.
  8. Step 8 · Days 5 to 6

    Leadwork

    Anywhere the roof meets a chimney or a wall needs flashing, and we use lead, cut and dressed by hand. A chimney gets an apron across the front, step and cover flashings up the sides, and a back gutter behind it to carry the water round. Valleys, where two slopes meet in a dip, are lined in lead too.

    Flashing
    A strip of lead that seals the joint where the roof meets something.
    Code 4 lead
    The standard thickness of lead for flashings.
  9. Step 9 · Day 6

    Fascias, soffits and gutters

    If you're having the roofline done, this is when it happens: new uPVC fascia boards along the ends of the rafters, vented soffits underneath so air can get into the roof, and new gutters and downpipes. No more painting, and the rain goes where it should.

    Fascia
    The board along the bottom edge of the roof that the gutter is fixed to.
    Soffit
    The board underneath that closes the gap back to the wall.
  10. Step 10 · Day 7 and after

    Signed off and tidied up

    We clear up, sweep the drive and garden with a magnet for stray nails, and check every gutter runs. The scaffold comes down soon after. A re-roof needs Building Regulations sign-off, so we sort that, and you get the certificate along with your 10-year written guarantee.

Days are for a typical 3-bed semi in reasonable weather. Bigger or more complicated roofs, and wet weeks, take longer.

How you can help

  • Move cars off the drive if the scaffold or skip needs the space.
  • Cover or move anything stored in the loft. Dust gets in when the old roof comes off.
  • Let your neighbours know. Semis and terraces share a roof line, and the scaffold may need to go near their side.
  • Keep children and pets away from the scaffold and the skip.
  • You don't need to be in all day, but we'll need to reach you if we find something unexpected.

Next time it rains, just listen.

A new roof, done properly, with a fixed price before we start.